Price Protection Kit Download

Your kit is ready.

Eight pages of contract language, checklists, and a cost tracker. Download it now, or grab it from the email we just sent.

Download the kit (PDF)

We also emailed it to you. If it hasn't arrived in a few minutes, check your spam folder, or email [email protected] and I'll send it over.

The Price Protection Kit for Contractors

Do these two things this week

The kit takes an afternoon to work through. If you only get to two things, make them these.

FIRST

Add the expiry line to your quote template

Page 2 has the wording. Put it in the template itself rather than adding it manually, because the job you forget on will be the one that matters. Ten minutes.

SECOND

Send the escalation clause to your lawyer

Page 3 has three versions. Pick the one that fits how much pushback you expect, forward it, and ask them to check it against your standard contract.

The third thing is harder to do on paper

Page 6 is a material cost tracking sheet. It works, but tracking estimated against actual cost by hand only lasts as long as your patience does. Jobtable does it on every job automatically, so a job going sideways shows up in week three instead of at year end.

See how Jobtable does it